Water Conservation & Median Upgrades on Mowry Avenue

This project removes and disposes of the original high water using landscape and inefficient irrigation in the central median on Mowry Avenue. This includes much of the existing impervious concrete paving, all trees, shrubs and turf, and the existing spray irrigation system. It preserves and protects all existing street lights, street signs and traffic signs. The demolition will be followed by the installation of an efficient bubbler irrigation system, new shrub and tree planting, ornamental boulders, a permeable paver maintenance band and cobblestone paving areas.

L3.3 Water Conservation & Median Upgrades on Mowry Avenue
L3.4 Water Conservation & Median Upgrades on Mowry Avenue

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer